Victoria University Antarctic Research Expedition Science and Logistics Reports 1984-85: VUWAE 29
Monday 5
Monday 5
Core recovered | Log sheet # | Described |
70.06 to 72.26 | 35 | ✓ |
72.18 73.64 | 36 | ✓ |
73.64 76.19 | 37 | ✓ |
76.19 79.02 | 38 | ✓ |
79.05 81.44 | 39 | ✓ |
81.54 83.01 | 40 | ✓ |
Surveying. New drum beacon built. Inner control of southern New Harbour completed (NH1, F2, F3) and beacons left. Position of CIROS 2 co-ordinated. Topographical survey of drill site.