28 Oct Gillespie and Woolfe to Scott Base (after 2 days delay in CHCH).
29 Oct Event brief, preparation of field gear.
30 Oct Preparation of sledges and toboggans, test run to Turtle Rk.
31 Oct Repacking food boxes.
1 Nov Modification of sledge ropes, towing and personnel lines.
2 Nov Aircraft Delay: Henare in CHCH (weather).
3 Nov Aircraft Delay: Henare in CHCH (weather).
4 Nov Henare to Scott Base, party to ice fall for snow and ice travel in evening.
5 Nov Shake down trip to Aurora Glacier with K221 and leader of survival School.
6 Nov G7 dropping gear box oil, Gillespie and Woolfe return Scott Base to pick up oil, then return to Aurora Glacier. Party returns Scott Base.
7 Nov Henare on day 2 of Survival Course.
8 Nov Aircraft Delay: Recce flight cancelled due to weather.
9 Nov Recce flight abandoned, bad weather in Darwin Glacier and at Allan Hills. Used 4.30 hrs LC-130 support.
10 Nov G7 and G8 on test run to Windless Bight, G7 still dropping gear box oil; recce flight, Darwin Glacier completed, Allan Hills abandoned due to bad weather.
11 Nov G7 test run, still dropping gear box oil.
12 Nov Aircraft Delay: Put cancelled due to weather.
13 Nov Aircraft Delay: Scott Base invitation golf classic.
14 Nov Aircraft Delay: Put in cancelled due to weather.
15 Nov Aircraft Delay: Put in cancelled due to weather.
16 Nov Put in to Darwin Glacier near Richardson Hill. Crevasse opened on first drag, but aircraft too heavy to take off, K047 and K221 put in. Moved camp to Colosseum Ridge 79° 48′S 156° 25′E.
17 Nov Strong westerlies, recce Colosseum Ridge.
18 Nov Geology northern end of Colosseum Ridge.page 50
19 Nov Geology Colosseum ridge to Trail Ridge.
20 Nov Cross Smith Glacier on foot, section measuring Haskel Ridge,
21 Nov Camp Move: Return landing site to pick up fuel, move to plateau side of Haskel Ridge. Travel difficult, crevasses, hummocky blue ice and sastrugi. Threw track off G7. Arrive camp 0330 hrs (79° 42′S 155° 48′E).
22 Nov Rest day.
23 Nov Recce route on to Hatherton Neve and geology of Nunataks westward from camp. Section measuring Haskell Ridge.
24 Nov Section measuring on un-named nunatak westward of camp.
25 Nov Bad Weather prevents trip to Turnstyle Ridge. Night move to Hatherton Glacier 79° 56′S 155° 48′E.
26 Nov Rest day.
27 Nov Geology upper Hatherton Glacier.
28 Nov Local geology, sort day due to 30 kt westerlies.
29 Nov Gillespie and Woolfe to section J3, Henare local geology.
30 Nov Local Geology.
1 Dec Gillespie and Woolfe cross Hatherton Glacier on foot for section measuring, Henare local geology.
2 Dec Henare and Woolfe local geology, Gillespie repairs and maintenance at camp.
3 Dec Local geology.
4 Dec Local geology.
4 Dec Moved camp to lower Hatherton Glacier (79° 52′S 157° 14′E).
5 Dec Local geology.
6 Dec Local geology.
7 Dec Travelled up Hatherton Glacier to un-named ridge 4 km above camp.
8 Dec Travelled to Junction Spur, geology. Marked out site for air drop.
9 Dec Air drop arrived mid-afternoon, change back to working days.
10 Dec Moved camp to 6 km SE of Mt Hughes (48 km).
11 Dec Tentacle Ridge, geology.
12 Dec Tentacle Ridge, geology.page 51
13 Dec Spot Height 1960, north of camp, geology. Discovered abundant fish remains near summit.
14 Dec Packed camp set off for Island Arena.
15 Dec Arrived at put-in site early morning, then moved camp to Island Arena (79° 50′S 156° 25′E) distance travelled 58 km.
16 Dec Partial white out, probed landing site for crevasses but probing near useless with crevasse bridges being largely undetectable.
17 Dec Partial white out, low cloud and snow.
18 Dec Partial white out, low cloud and snow.
19 Dec Aircraft Delay, low cloud and snow.
20 Dec Aircraft Delay, gale to storm force westerlies.
21 Dec Aircraft Delay, strong to gale force southerlies packed up camp.
22 Dec Aircraft Delay: Pull-out abandoned, plane breaks through crevasse on first drag.
23 Dec Aircraft Delay: Visited Trail Ridge, geology.
24 Dec Aircraft Delay: Received airdrop in early morning, low cloud and snow by evening.
25 Dec Aircraft Delay: Low cloud and snow.
26 Dec Aircraft Delay: Low cloud and snow, left late for Roadend Nunatak, steering by compass at first.
27 Dec Aircraft Delay: Arrived Roadend Nunatak (79° 49′S 158° 05′E), low cloud and fog.
28 Dec Aircraft Delay: Low cloud and fog, local geology.
29 Dec Aircraft Delay: Recce flight early morning unsuccessful because of mid-level cloud. Moved camp to Mulgrew Nunatak.
30 Dec Aircraft Delay: Local geology.
31 Dec Aircraft Delay: Returned to Roadend Nunatak.
1 Jan Aircraft Delay: Heavy snow.
2 Jan Aircraft Delay: Local Geology, recreation day.
3 Jan Aircraft Delay: Marking out new strip, low cloud etc.
4 Jan Aircraft Delay: Weather clearing slowly, packed up camp and moved to new landing site.
5 Jan Party returned to Scott Base, Henare returns NZ.
6 Jan Preparation of field gear, packing rocks.page 52
7 Jan Gillespie and Woolfe Helo to Elkhorn Ridge (76°40′S 161°06′E)
8 Jan Local geology.
9 Jan Marginal weather, local geology.
10 Jan Cross Towle Glacier on foot, measured section on Mt Naab, returned to camp by late evening.
11 Jan Rest day.
12 Jan Local geology. Barrett to Scott Base.
13 Jan Local geology. Barrett to Survival School.
14 Jan Crossed Northwind Glacier on foot, geology at Flagship Mountain.
15 Jan Helo Delay: Snow and low cloud.
16 Jan Helo Delay:
17 Jan Helo delay:
18 Jan Barrett joins party, party moves to Allan Hills.
19 Jan Local geology.
20 Jan Local geology.
21 Jan Local geology.
22 Jan Local geology.
23 Jan Local geology.
24 Jan Party returns Scott Base.
25 Jan Packing rocks, cleaning and return of field gear.
26 Jan Packing rocks, return of field gear.
27 Jan Barrett and Woolfe to Christchurch.