Victoria University Antarctic Research Expedition Science and Logistics Reports 1991-92: VUWAE 36

K042 91-92 LOGISTICS REPORT #2

page break

LOGISTICS REPORT

K042: ROV Grounding Line Study of the Mackay Glacier Tongue

Antarctica New Zealand November 1991 - December 1991

K042 91-92 LOGISTICS REPORT #2

page break

1. AIMS.

This season we had proposed to run two programmes together; 1.,vibrocorer sampling of the sea floor in Granite Harbour and 2., the study of the Mackay Glacier Tongue Grounding line with a remotely operated submersible vehicle (ROV). At the end of September we postponed the vibrocorer programme because the equipment was not ready and satisfactorily tested but received RDRC permission to continue with the ROV-grounding line study.

Mackay Glacier forms a 3 km wide, 300 m thick, "floating" glacier tongue that moves seaward at 250 ma−1 when it enters Granite Harbour, an embayment up to 900 m deep on th Victoria Land coast. The project is to observe and describe, for the first time, the ineraction between a polar glacier tongue, sediment and sea water at the detachment point (grounding line) using a remotely operated submersible vehicle (ROV).

We propose to study the subglacial delta presumbed to have formed as basal debris carried in the glacial tongue melts out. (Macpherson 1987, Alley et al. 1989). The existence of subglacial deltas and sedimentation processes requires testing to provide better models to compare with seismic data from the Antarctic continental shelf where a number of examples of delta like sedimentary bodies have been observed (Cooper et al. 1990).

The principal objectives for this seasons research are;
1.Determine the character and thickness of the basal debris layer in the glaciers.
2.Evaluate grounding line processes including debris meltout, sediment deformation, meltwater production (if any) and ground line stability.
3.To check if a subglacial delta exists.

2. PLANNING.

Planning this seasons programme was more difficult than usual because of the uncertainty about the completion of the vibrocoring equipment. We were very pleased that DSIR Antarctic and RDRC understood the developmental problems with the vibrocorer and responded positively to allow us to complete the ROV part of the programme when it became clear the vibrocorer programme could not proceed this season.

We had arranged a "final decision" date with DSIR Antarctic in late September and appreciated that this was a very late date to decide on programme changes for logistic planning.

DSIR Antarctic arranged with NSF for K042 to borrow a Nodwell vehicle with Hiab crane from McMurdo station since it was not possible to air lift the equivalent NZARP vehicle this season. Early inquiries had been made by Dr Rob Dunbar to NSF for the use of the vehicle by K042 in a cooperative programme and this probably assisted DSIR's request.

page break

Our flight date to Antarctica was put back 7 days because of the delay of the ROV cargo arriving in Christchurch from United states (see below for details). This was a sensible delay for the K042 group, however the surveyor (K191) was also delayed because his first main task was the K042 programme. In retrospect the surveyor should have carried out some of his Scott Base programme before K042 arrived.

3. Cargo

The event cargo that originated in Wellington was transported efficiently to Scott Base. The ROV cargo which originated in the United States was however delayed in reaching Christchurch. This cargo was consigned from Illinois with the shippers guarantee that it would be on a ship due to arrive in Lyttleton on 1 November, six days before K042 scheduled departure to Antarctica. The cargo was incorrectly manifested in Los Angeles and then would not have arrived in Auckland until early December. The shipping company did not admit the problem until early November when the cargo did not arrive in New Zealand. The ROV cargo was unloaded off the ship and docked in Los Angeles on 5 November then airfreighted at the shippers expense and arrived in Christchurch on 10 November.

We appreciated the flexibility and efficiency shown by DSIR Antarctic personnel to finally get our equipment to Scott Base in a situation outside our control.

The return of the ROV equipment from Scott Base to Christchurch was also delayed until late January and it was disappointing that it was not given a higher priority at Scott Base when it was ready on 9 December. Because of this planning winter field work in Alaska in March where the ROV could next be deployed was cancelled.

In the future we would hope to plan on air freighting this equipment between USA and NZ which should avoid our major freight problem this year. A more formal system to return priority equipment such as the ROV to New Zealand would also assist future programmes and should be coordinated by the Operations Manager at Scott Base.

Table 1. Cargo to Scott Base.
Description Cube Weight Freight Type.
Origin Wellington
Green box; scientific equipment 1 .18m3 460 kg Air, cargo
Green box; scientific equipment 0.25 m3 = 70 kg Air, cargo
Alloy tubing (3 cm long) 0.015 m3 = 10 kg Air, cargo
S4 current meter 0.073 20 kg Air, accompanied
Laptop computer-printer (2 cases) 0.05 15 kg Air, accompanied
Chilly bin (ROV dredge) 0.1 40 kg Air, accompanied
Underwater camera (2 cases) 0.1 20 kg Air, accompanied
Origin USA page break
ROV equipment 1 crate 1.13 } Air, cargo
ROV equipment 2 crate 1.26 } Air, cargo
ROV equipment 3 crate 1.01 } Air, cargo
ROV equipment 4 crate 0.056 } Air, cargo
ROV equipment 5 crate 0.056 } Air, cargo
ROV equipment 6 crate 0.022 } Air, cargo
ROV equipment 7 grey suitcase 0.25 }830 kg Air, cargo
Table 2. Cargo from Scott Base.
Description Cube Weight Freight Type.
Destination Wellington
Green box; scientific equipment 1.18 m3 460 kg Air, cargo
Green box; scientific equipment 0.25 m3 = 70 kg Sea, cargo
1 pallet & box (LTS container equipment) 2.0 m3 = 450 kg Sea, cargo
S4 current meter 0.073 20 kg Air, accompanied
Laptop computer-printer (2 cases) 0.05 15 kg Air, accompanied
Chilly bin (ROV dredge) 0.1 40 kg Air, accompanied
Underwater camera (2 cases) 0.1 20 kg Air, accompanied
Destination USA
ROV equipment #1 crate 1.13 } Air, cargo
ROV equipment #2 crate 1.26 } Air, cargo
ROV equipment #3 crate 1.01 } Air, cargo
ROV equipment #4 crate 0.056 } Air, cargo
ROV equipment #5 crate 0.056 } Air, cargo
ROV equipment #6 crate 0.022 } Air, cargo
ROV equipment #7 grey suitcase 0.25 }830 kg Air, cargo

4. Personnel

Alex PyneLeaderARC, Victoria University
Eric BroughtonScience technicianGeophysics, Victoria University
Ross PowellUS ScientistGeology, Northern Illinois Unviersity
Garth FallonNZARP Surveyor (K191)Dept of Survey and Land Information
Sean HeaphyField/MechanicDSIR Antarctic
Dave StathamPlant OperatorN.Z. Army

Our group of field personnel were compatible, enthusiastic and worked well together. The success and enjoyment of the field programme is a consequence of a good field group. It was also pleasing to note that all personnel showed individual initiative when needed to get the work completed.

5. Preparations for the Field

i)Our initial reception, planning and liaison principally with the operations manager at page break Scott Base was good. The opportunity ice reconaissance helo flight during a RNZAF helo testflight and pilot familiarisation was a good example of Scott Base management planning and flexibility.
ii)We were very appreciative of the space made available to us in the Scott Base garage. Without this is would have been Impossible to assemble and test the ROV systems for the field. Space such as this is obviously a requirement for field events who have complicated equipment to assemble and we hope that a warmed area can be made available to field groups in the future. As expected the testing of ROV took several days and would be likely to take a similar period in a future programme.
iii)The field training programme was more personalised this season because it did not have to accommodate US personnel who often have very different requirements to our own. Our new and old members enjoyed the course however in some cases a course could still be tailored more to the event requirements and skills of event personnel. The question of an appropriate course is also raised each season when experienced personnel are considered who visit Antarctica regularly (each season).

6. Field Transport

ia)NZARP Vehicles. D5 Bulldozer. This vehicle performed reliably in the field with no major problems. A small glycol leak developed in cab heater but this seems to occur each season. A normal maintenance schedule was carried out in the field.
ib)US Vehicles. A Nodwell tracked vehicle with Hiab crane was made available by NSF to this project. The vehicle was checked before departing Scott base and rechecked before return to McMurdo. No significant problems occurred with this vehicle and a small hydraulic leak in the auger circuit was present the entire time that we had use of the vehicle. A normal maintenance schedule was carried out during the field period.
ii)Bombardier Alpine II skidoos. Two vehicles with two VUW boxsledges were used by this programme for reconaissance; surveying and movement of small equipment. The skidoos were sledged most of the way to Cape Roberts on the larger "Italians" Maudheim sledge. The skidoos were used mostly in Granite Harbour and on the return journey to Blue Glacier and Scott Base. Most of the travel was on snow covered sea ice except the bare sea ice around the Mackay Glacier Tongue and South of the Stranded Moraines. Two problems occurred with the running gear of the skidoos. On one machine the steering rod-ski connection sheared at the ski and on the other machine a set of idler wheels became disconnected. Both these problems have occurred on the same model machines used at McMurdo. Travelling on sea ice especially when there is little snow cover is naturally hard on the running gear of skidoos and this type of occasional breakage should be anticipated if the running gear is not strengthened in subsequent models.
(ii)Aircraft operations. Helicopter sea ice reconaissance. One person in our event (A. Pyne) was manifested on a RNZAF opportunity helo to determine the best sea ice route to Cape Roberts and accessible ROV sites around the MacKay Glacier. This operation was page break very successful and invaluable when we had to find an alternative route near Cape Bernaccahi on our return south. It was unfortunate that other members of the event could not participate on this flight because of USAP helicopter problems at this time. In future we would try to have our event personnel on this flight to help them familiarise themselves with the proposed route and other features.

7. Event Diary

13 Nov. Pyne, Broughton, Powell and Falloon (K191 surveyor) to Scott Base, C141 with 2 RNZAF helos and crew.
14 Nov. Unpacking ROV equipment and getting cargo ready for Cape Roberts including K024 cargo (2/3 of a cantago sledge). Pyne on sea ice helo reconn. (RNZAF helo in evening) to L. Fryxell, L. Bonney, Marble Pt. Mackay Glacier Tongue.
15 Nov. Continue preparations at Scott Base.
16 Nov. Broughton, Powell, Falloon on sea ice survival course in morning. Pyne and Statham with skidoos pick up Falloon at Turtle rock then restablish trig rock cairn at Tent island and survey McMurdo Mooring site.
17 Nov. Broughton, Powell continue on survival course. Pyne on one day refresher course.. Continue work on ROV in evening and preparing cargo.
18 Nov. Preparing ROV and cargo. Heaphy pick up T.REX nodwell from McMurdo and check for the field.
19 Nov. Preparing ROV and in water tests in TVNZ hole in front of Scott Base.
20 Nov. Final packing of ROV and cargo train. Depart Scott Base @ 1648 hrs in moderate visibility conditions. Visibility decreasing (1920 hours) navigating with GPS and sun. Stopped @ 2230 for night, no visibility @ 77° 47′ 18″S, 166° 16′ 31″E. Two American Navy Deltas following since Ice Runaway.
21 Nov. Away @ 0907 hrs. Good visibility and clear ice to off Marble Pt. where Deltas left us 1300-1400. Continue on to Cape Roberts.
22 Nov. Arrive Cape Roberts 0200. Unload cargo for K024 in afternoon. Check tide gauge and download storage module data. Visited by 3 Greenpeace personnel. Unload K024 cargo # C. Roberts beach. Leave fuel sledge of sea ice and Cape Roberts. Depart 2216 hrs. towing Apple sledge.
23 Nov. Arrive Mackay Glaicer Tongue (MGT) on south side (site 1) @ 0130 hrs. Make ROV drive hole in tide crack next to MGT ice wall by drilling and explosives.
24 Nov. Two ROV dives @ site 1 (MGT 91-1, MGT 91-2) Reconn. north side of MGT, all personnel with skidoos.
25 Nov. Two ROV dives @ Site 1. (MGT 91-3, MGT 91-4).
26 Nov. To north side (armpit) of MGT by 1320 hrs and make site 2 access hole. Masses of platlet ice at this site, cleared with 44 gal drum and T. REX.
27. Nov. Preparing and checking ROV. Current meter found to be flooded probably due to leaking connector where repaired.
28 Nov. Two dives @ site 2. (MGT 91-5, MGT 91-6).
29 Nov. Two dives @ site 2. (MGT 91-7, MGT 91-8)
30 Nov. Move to site 3, down glacier on north side. Prepare dive hole and check ROV.
1 Dec. One dive @ site 3 (MGT 91-9). CTD instrument problems Falloon and Heaphy to survey at Dunlop island by skidoos.
2 Dec. One dive @ site 3 (MGT 91 -10) CTD instrument problems. Pyne, Statham page break to Cape Roberts to visit helo & VIP partly in afternoon.
3 Dec. Leave MGT (1243 hrs) for Cape Roberts (1515 hrs). Falloon leaves earlier to set up tide gauge leveling, then checked transducer with underwater camera. Pyne and Powell sampling MGT debris icebergs then to Cape Roberts
4 Dec. Replaced metmast anemometer and downloaded CR10 storage modules. Returned 1 module for resetting in New Zealand to return to Cape Roberts with Falloon in Jan 92. Falloon complete 24 hour tide gauge leveling then Powell and Falloon to Dunlop Island with skidoo for surveying. TREX and D4 leave Cape Roberts = 1400 hrs. Pyne and Broughton follow after clean-up @ 1515 hrs. Arrive @ Cape Bernacchi 1100 hrs @ John McDonalds camp near iceberg.
5 Dec. Depart Cape Bernacchi 1312 hrs arrive 1915 hrs at Blue Glacier in light falling snow.
6 Dec. Drill ROV dive hole with T.REX. Prepare ROV and two dives (BG 91-1, BG 91-2).
7 Dec. Depart Blue Glacier @ 1219 hrs for McMurdo Mooring site arriving @ 1700 hrs. Prepare ROV for dive. Pyne and Powell check Blue Glacier surface runoff then follow on skidoo.
8 Dec. Recover McMurdo mooring after releasing acoustic release with ROV. Return to Scott Base by 0130 hrs (9 Dec).
9 Dec. Packing and cleaning equipment for return to NZ and USA.
10 Dec. Cleaned up equipment and T.REX for return to McMurdo. Didn't fly to NZ tonight as expected.
11 Dec. Cleaned NZI. Pyne, Broughton clean out VUW equipment in university LTS container for ship return to New Zealand. Pyne, Powell, Broughton RTNZ 2330 hrs. Arrive 0830 (12 Dec).

8. Event Routes

The helo sea ice reconn flight was Invaluable when planning the vehicle route to Granite Harbour.

We had no major difficulties with the sea ice route and generally surface travel conditions were good. We crossed a crack (0.6m wide) trending east from Cape Bernacchi on route to Granite Harbour (21 November) without any problems. This crack was only 1 -2 days old and continued to widen during the 12 days we were in Granite Harbour. This crack was crossed easily about 1 km offshore off Cape Bernacchi where it split and was only 0.5 m wide on the return journey (4 December). Another crack was crossed between the north end of Dunlop Island and Cape Dunlop going to Granite Harbour (21 November). This crack had widened on our return journey but a crossing place was found and T.REX crossed successfully. The crossing poing however was not suitable for the D5 and it crossed on a better area about 4 km offshore off Dunlop Island. A crack was also present trending southeast from the Stranded Moraines and this was also crossed at a suitable site without difficulty on the journey to Blue Glacier.

The sea ice in Granite Harbour was in very good condition with the normal pattern of cracks acoused by the Mackay Glacier Tongue. The ice in the Harbour would have remained suitable for surface travel well into mid December.

We believe that it would be feasible to work on Granite Harbour sea ice well into mid December if heavy vehicles could be wintered at Cape Roberts so that they did not have to make the return journey along the coast after early December.

page break

9. Weather

Poor weather only hindered our operation on leaving Scott Base when visibility disappeared (≈ 20 km in route) and at the McMurdo Mooring site on our return.

The weather in Granite Harbour was very good with usually clear mornings and summer cloud developing in the mid afternoon.

11. Field Equipment

i

The field clothing now available from DSIR Antarctic is very good and kept well up to date. We did find the new windproof bib trousers and jacket to be a bit stiff and the coarse material is very sticky and wet on snow. The older Fairydown material is better in this respect but the cut of the new garments are good.

Gloves are still a problem especially with our sea-sea ice based programmes, where hands get wet from working in the sea. We require finger gloves that are waterproof, flexible and insulating.

iiiWe were pleased to be able to add to the NZARP 20 manday ration box with some foodstuffs from Scott Base e.g. eggs, cream, yeast for bread; bread, fresh and frozen food. Wannigan living enables us to cook this type of food easily and we would hope to be able to still get these supplies in the future.
iv

K042 used wannigan NZI as a kitchen-messing and sleeping unit. The wannigan is well set up for up to 4 people but is a bit more difficult with our 6 event personnel. We temporarily installed a microwave oven for our period in the field because NZl lacks an oven but it would still be better to have a small LP gas combination oven-cook top installed especially for 6 people Space is very limited in the wannigan and better sort of waste handling system could be provided such as 2 or 3 plastic "kitchen tidy" bins appropriately colour coded to split burnable, non-burnable and aluminium refuge before storing outside in larger plastic drums on the cargo sledges.

K042 also used the NZARP apple and sledge to set up the ROV control equipment. The apple was suitable for this purpose but its sledge is not very suitable. The sledge does not tow properly on a strop and had to be towed between heavy sledges to stop it crabing sideways. The runners are too wide for good towing and melt in to the ice when its sunny and the sledge transmitts excessive vibration into instruments in the apple so it had to be towed very slowly.

vi

We used the NSF Nodwell vehicle (TREX) as detailed in section 6(ib) and also a 5kVA (110V, 60Hz) ONAN generator to operate the ROV.

All our equipment was returned to Scott Base in good condition. The return of equipment to Scott Base field store men was generally satisfactory except that it seems that the science personnel are expected to increasingly do more of the work that was traditionally winter work for the field storeman. An example of this is the unpacking and cleaning of food boxes and airing of sleeping bags. Most event scientist personnel have a lot of work to do to clean and pack up their scientific equipment in a short time and they should not be considered free labour by Scott Base personnel during this critical time.

We used the 1 day delay at Scott Base before returning to New Zealand to sort and pack redundant VUW equipment stored in University LTS container.

12. Radio Communications

Communications were generally good this season. The Codan SSB unit installed in NZl never let us down when we were out of VHF line of site communication in Granite page break Harbour and in some coastal areas. The coordination between Scott Base radio operators and the operations manager was also very good and it was reassuring that the operations manager was prepared to talk directly to field parties.

13.

K042 used space in the garage to prepare the ROV equipment. This area is a far more practical workspace than the Scott Base lab for field events with large items of equipment that require assembling and testing in a warmed area.

14. Refuge Huts

The Cape Roberts Hut was used by K042 for one day (22 November) while unpacking cargo for Botany Bay. Fuel unloaded or stored at Cape Roberts on 22 November was as follows.

JP8 (209 l drums); # A892 MT, #A894, #A90189, A8948
JP8 (1 × 60 l); old drum no code.
Mogas (209 l drums); #A8945, #A892
LPG #NZB029

We picked up the apple hut and sledge and used this in Granite Harbgour then returned it to Scott Base.

15. Environmental Impact.

All burnable and non burnable waste was returned to Scott Base. To help manage these wastes in the field on this type of programme plastic barrels with lids could be provided to store separated wastes on the cargo sledges.

Human waste was deposited in augered holes in the sea ice. This is the cleanest and lowest impact method as the wastes are naturally macerated and dispearsed when the sea ice melts and breaks out.