18 Management of Science in the Ross Dependency

18 Management of Science in the Ross Dependency

Apart from problems with communications, noted above, NZAP is very capable of catering for our type of work.

We were disappointed that we were taken out of the field early, before we had completed our programme. Two more days would have seen our programme 100% complete. When one considers that we were able to maintain our scheduled programme up to that time, despite indifferent weather and transport delays, I believe another move for us was justified.

page break
Figure 1: Map showing locations of field sites.

Figure 1: Map showing locations of field sites.

page break
Figure 2(a). Adam and Nerida collecting samples from the Sirius deposits, Table Mt.

Figure 2(a). Adam and Nerida collecting samples from the Sirius deposits, Table Mt.

Figure 2(b). Orienting drill cores, Mt Crean.

Figure 2(b). Orienting drill cores, Mt Crean.

page break
Figure 3a, Returning from lower Sirius section, Table Mt.

Figure 3a, Returning from lower Sirius section, Table Mt.

Figure 3b. Normal state of the solar panel.

Figure 3b. Normal state of the solar panel.