Other formats

    Adobe Portable Document Format file (facsimile images)   TEI XML file   ePub eBook file  

Connect

    mail icontwitter iconBlogspot iconrss icon

Victoria University Antarctic Research Expedition Science and Logistics Reports 2000-01: VUWAE 45

Summary

Summary

Dickinson and Pyne spent 39 days in the field and 5 days at Scott Base. Of the field days, 9 (includes one no-fly Sunday) were spent waiting on weather to clear. An additional 3-4 days page break were lost to technical problems with the drilling system. In all, 17 holes were drilled in three areas, Lake Vida, Allan Hills, and Table Mt and a total of 42.44 m of core were recovered for 48.44 m drilled.