Victoria University Antarctic Research Expedition Science and Logistics Reports 2000-01: VUWAE 45
Summary
Summary
Dickinson and Pyne spent 39 days in the field and 5 days at Scott Base. Of the field days, 9 (includes one no-fly Sunday) were spent waiting on weather to clear. An additional 3-4 days page break were lost to technical problems with the drilling system. In all, 17 holes were drilled in three areas, Lake Vida, Allan Hills, and Table Mt and a total of 42.44 m of core were recovered for 48.44 m drilled.