Other formats

    Adobe Portable Document Format file (facsimile images)   TEI XML file   ePub eBook file  

Connect

    mail icontwitter iconBlogspot iconrss icon

Victoria University Antarctic Research Expedition Science and Logistics Reports 2004-05: VUWAE 49

LOGISTIC NOTES

page 4

LOGISTIC NOTES

EVENT DIARY

Date Main Activities and Location Other Comments
Nov. 14-15 Cavanagh & Matheson (K450) to C. Roberts from Scott Base Hagglunds traverse
16 Pyne & Kingan to C. Roberts from Evans P. Gl. Transfer from K049 by Twin OtterREFUGE AND RESEARCH HUTS
16-19 Calibration, levelling and Maintenance of the tide gauge at Cape Roberts
19 Party of 4 return to Scott Base

REFUGE AND RESEARCH HUT

refuge/research hut name Cape Roberts Huts
Overall condition Good
Scale and condition of provisions
Suitability of location
Unnecessary equipment or rubbish/debris in the area None, removed on previous K049 traverse 28-29 Oct.

Comment: Some Science equipment was left in the accommodation hut (Palace) for return in January to Scott Base ANDRILL LST container.

ENVIRONMENTAL IMPACT

*Sites Visited

Site name Cape Roberts
Site location (coordinates/description)
Dates occupied 15-19 November
Total days (or hours) at site
Maximum number of people at site (your event) 4
Total person-days (or person-hours) at site 16 man days
Main activity undertaken Cape Roberts Tide Gauge
Cumulative impacts observed None

Chemicals

Chemical form Calcium Chloride
Quantity used 1 kg
Location of use
Purpose Melting ice at tide gauge transducer.

Chemicals

Chemical form Ethanol
Quantity used 5 litres
Location of use
Purpose Melting ice at tide gauge transducer.

Waste management

Location Cape Roberts
Approximate quantity Urine
Disposal methods Tide crack

Comment: Rubbish and solid human wastes returned to Scott Base